Abstract
IN the Electrical Times of August 3, A. G. Moss describes the rapid and confident way-in which Poland is developing hydro-electric power schemes within her boundaries on a long-term basis, and having obviously the utmost confidence in the future. In Great Britain, on the other hand, the tendency at present seems to be to limit financial forecasts to the next few uncertain months due to possibilities of war.
Article PDF
Rights and permissions
About this article
Cite this article
Electrical Progress in Poland. Nature 144, 341 (1939). https://doi.org/10.1038/144341a0
Issue Date:
DOI: https://doi.org/10.1038/144341a0