Abstract
Professor Schofield's appraisal of a recent Greater London Council report on ways of preventing the impending disaster in the flood plain of the River Thames includes the cost of risk of future loss. At present values, it appears economic to use sandbags immediately to raise the embankments.
This is a preview of subscription content, access via your institution
Access options
Subscribe to this journal
Receive 51 print issues and online access
$199.00 per year
only $3.90 per issue
Buy this article
- Purchase on Springer Link
- Instant access to full article PDF
Prices may be subject to local taxes which are calculated during checkout
Similar content being viewed by others
References
Thames Flood Prevention Barrier/Barrage Project, First Report of Studies (Greater London Council, 1969).
Suthons, C. T., Proc. ICE, 25, 433 (August 1963).
Technical Possibilities of a Thames Flood Barrier, Cmnd 956 (HMSO, London, March 1960).
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
SCHOFIELD, A. Cost of Preventing Thames Tidal Flood. Nature 227, 1203–1204 (1970). https://doi.org/10.1038/2271203a0
Issue Date:
DOI: https://doi.org/10.1038/2271203a0
Comments
By submitting a comment you agree to abide by our Terms and Community Guidelines. If you find something abusive or that does not comply with our terms or guidelines please flag it as inappropriate.