Following the destruction of a bridge segment at the Kakhovka Dam on November 11, 2022, irregular operation of the spillway gates led to a prolonged overflow, causing erosion of the spillway foundation, as indicated by satellite data, meteorological reanalysis, and dam design criteria analysis.
- Qing Yang
- Xinyi Shen
- Emmanouil N. Anagnostou