Table 6 Land area requirements for the MgO looping process.

From: Ambient weathering of magnesium oxide for CO2 removal from air

 

Lower bound

Upper bound

1 GtCO2

CO2 captured [MtCO2 yr−1]

60

180

1000

Total plot land area [Mha]

0.04

0.11

0.61

Grid electricity land area [ha]

91

286

1,500

Solar electricity land area [ha]

8,300

26,100

138,000

Total land area (grid) [Mha]

0.04

0.11

0.61

Total land area (solar) [Mha]

0.05

0.14

0.75